Persona 01 / Workshop manager

Workshop manager dashboard

Live operational view across all six bays — what's on the rack, who's running late, where the revenue is pacing, and which alerts the supervisor needs to act on before close.

Production answer

Workshop manager dashboard is a reusable Oak Flats Muffler Men UI primitive with documented states, accessibility expectations, theme behavior, and implementation evidence.

Primary CTAReview Workshop manager dashboard states
Generative search brief

Workshop manager dashboard: Live operational view across all six bays — what's on the rack, who's running late, where the revenue is pacing, and which alerts the supervisor needs to act on before close.

Workshop manager / Today

Today at Oak Flats

Live operational view across all bays — jobs flow, revenue pace, technician utilization, and the alerts you need to act on before close.

Live · syncedAuto-refresh · 30s
Today at the bays
  • Today's jobs

    4 in the bay, 9 on rack, 5 awaiting parts.

  • Revenue posted

    Through 14:20 — pace +18% vs Tuesday.

  • Bays in use

    Bay 5 down for compressor service.

  • Avg cycle

    Within target band 3.0–4.2h.

Last sync · 14:20:38 AEST · Bay 5 maintenance scheduled tonight
Job boardLive
Live board

Job flow

Cards advance left to right — drag is non-interactive in this primitive mirror.

  • High priority
  • Medium
  • Low
Quote accepted2
  • JOB-2026-0418

    VE Commodore — twin 2.5" cat-back

    Booked Thu 09:30

    SedanS2
    Thu 09:30
  • JOB-2026-0419

    Ranger PX3 — DPF delete, ECU re-flash

    Customer awaiting call

    4WDDiesel
    Fri 08:00
On the rack2
  • JOB-2026-0411

    WRX STI — turbo-back, downpipe gasket

    Bay 1 · 2.5h consumed of 4h

    SubaruPerformance
    Today 16:00
  • JOB-2026-0414

    Hilux GUN126 — DPF clean & cat

    Bay 3 · 1h consumed

    4WDDiesel
    Today 17:30
Quality check1
  • JOB-2026-0407

    BT-50 — full system + flex pipe

    Sound check pending

    Ute
Handover2
  • JOB-2026-0401

    Pajero NX — straight pipe, recoded

    Photos + sound clip ready

    4WD
  • JOB-2026-0402

    Mustang GT — quad tip, weld correction

    Awaiting EFT confirmation

    Performance
Activity feedLive
  1. Iris Hawke

    Iris signed off JOB-2026-0401

    Sound clip uploaded — handover pack ready for Brett.

  2. Jonah Keene

    Parts delayed — Ranger DPF unit

    Supplier ETA pushed to Fri AM. Quoted alt sourced Magnaflow.

  3. Mateo Reyes

    Bay 5 compressor service complete

    Tagged back online, pressure test PASS @ 138psi.

  4. Iris Hawke

    Weld inspection failed — JOB-2026-0407

    Hairline gap on Y-pipe. Re-tacked, ready for re-check.

Performance / Pulse

Workshop pulse

Utilization, alert routing, and the rolling 7-day revenue curve.

Live · synced
Bay utilization14:20
Workshop utilization 68 percent todayRadial meter at 68 percent.68%Today
Target band 60–80%
Workshop utilization 74 percent rolling 7 daysRadial meter at 74 percent.74%7-day
Slightly above target
Alert routingPreferences
Manager alert channels
In-appSMSEmail
Parts late
Bay down
Handover ready
Revenue · 7dAUD
Workshop revenue last 7 trading daysGrouped bar chart with 1 series across 7 categories.050001000015000200009420112801046013840642012480TueWedThuFriSatMonTue