Primitive 14 / Process steps

Process steps

Five numbered steps with a dashed connecting line. Each card animates in on view via Reveal.

Production answer

Process steps is a reusable Oak Flats Muffler Men UI primitive with documented states, accessibility expectations, theme behavior, and implementation evidence.

Primary CTAReview Process steps states
Generative search brief

Process steps: Five numbered steps with a dashed connecting line. Each card animates in on view via Reveal.

How a Mufflermen install runs

From quote to kerbside — five steps, five days.

The standard install pipeline. Stage 2 dyno tune adds an extra day. Caravan rigs add two.

  1. Quote

    Send your ute model, exhaust photo, and postcode. We respond with a written quote in 24 hours.

  2. Book

    Pick a Stage 1, Stage 2, or custom slot. Workshop bay locked in. Manta parts pulled from the cage.

  3. Fit & dyno

    TIG welds laid on the bay. Pre and post dyno run at Albion Park. Torque sheet signed off.

  4. ADR sign-off

    ADR 83/00 docket stamped against your VIN. Lifetime crack warranty on every Mufflermen weld.

  5. Drive away

    Pick up the ute Wednesday afternoon. Sound check on the kerb. Coffee on the front desk.