WS-2604-12Hilux N80 GUN126R · Manta cat-back
64%- Drop-off08:14
- Diagnostic08:42
- Build09:30
- Test
- Handover
Per-job progress strip with Drop-off → Diagnostic → Build → Test → Handover checkpoints, plus an overall percentage that updates as stages tick over.
Live job progress strip is a reusable Oak Flats Muffler Men UI primitive with documented states, accessibility expectations, theme behavior, and implementation evidence.
Live job progress strip: Per-job progress strip with Drop-off → Diagnostic → Build → Test → Handover checkpoints, plus an overall percentage that updates as stages tick over.
Active checkpoints get an amber halo, completed stages a green dot with a tick, skipped stages strike through. Bar fill is teal when the job is in build, amber on test, signalling the changeover point to the next floor lead on shift.